5:00 am concrete pour at our @urbanspacerealtors new offices at @theindependentaustin Building a second floor with 42’ clear span concrete to not interrupt the flow of the ground floor space.
November 9, 2019
5:00 am concrete pour at our @urbanspacerealtors new offices at @theindependentaustin Building a second floor with 42’ clear span concrete to not interrupt the flow of the ground floor space.
Follow us on Instagram here: @michaelwesandco