5:00 am concrete pour at our @urbanspacerealtors new offices at @theindependentaustin Building a second floor with 42’ clear span concrete to not interrupt the flow of the ground floor space.

November 9, 2019


5:00 am concrete pour at our @urbanspacerealtors new offices at @theindependentaustin Building a second floor with 42’ clear span concrete to not interrupt the flow of the ground floor space.

5:00 am concrete pour at our @urbanspacerealtors new offices at @theindependentaustin Building a second floor with 42’ clear span concrete to not interrupt the flow of the ground floor space.

Like or comment

Follow us on Instagram here: @foursquarecommercial

Leave a Reply

Your email address will not be published. Required fields are marked *